TreeQ Power Electromechanical
RBI – Risk Based Inspection — TreeQ Power

Asset Integrity

RBI – Risk Based Inspection

Focus inspection where risk is highest

RBI – Risk Based Inspection — TreeQ Power

RBI – API RP 580 / 581

  • RBI basis, scope, assumptions and acceptance criteria
  • Damage mechanisms, corrosion loops and inventory groups
  • PoF, CoF, damage factor and risk drivers
  • Risk matrix and prioritized equipment list
  • Inspection method, coverage, effectiveness and due date
  • TML / CML mark-up, optimization and monitoring-location review
  • Mitigation plan, audit record and reassessment

Risk Levels

  • Very High Risk – Immediate Action
  • High Risk – Short Term Action
  • Medium Risk – Plan & Monitor
  • Low Risk – Long Term / Monitor

RBI Deliverables

  • Risk Ranking Equipment List
  • Inspection Plan & Intervals
  • Risk Drivers & Assumptions
  • Mitigation & Action Plan
  • Reassessment Triggers
  • Audit Trail & Reporting

Start a conversation

Bring us the technical requirement.

Contact TreeQ Power

Our Clients

Mina Petroleum, Oman logo
Advario (Formerly Oiltanking, Oman) logo
Penspen International Limited, UAE logo
DNV GL – Oman & UAE logo
REI OIL & GAS PROCESS SERVICES LLC logo
Bureau Veritas, Oman logo
Omniyat logo
Emaar logo
DAMAC logo
GE Vernova logo
Al Ghurair logo
Dubai Holding logo
Ejadah Asset Management Group logo
Energy Engineering logo
IQC Global Engineering LLC logo
Korean Techno Inspection Middle East Co. LLC logo
Emrill logo
Imdaad logo